百事论坛   本站首页   贵湖华人   主题论坛   滑铁卢黄页 
Linear        

Phase One would link downtown Toronto to Pearson Airport and the high-tech hub of Kitchener-Waterloo at speeds of up to 250 km/h, ending in London. 因为政治省际高铁取消,因为TTC政治,市际铁路中止。只有滑铁卢高科技线一支独秀 (水城百事)

by 滑梯路获得官方地位 高科技中心。, Thursday, May 25, 2017, 17:31

1316402 Postings in 191434 Threads, 2660 registered users, 528 users online (4 registered, 524 guests)
滑铁卢华人|KWCG生活论坛-Kitchener, Waterloo, Cambridge & Guelph华人的网上家园